Steele Newsreel logoBuilding House

 
Rear of house with vinyl 12-9-08 This page is a pictorial diary of the progress in building our house in Waxhaw, NC. The most recent pictures are at the top of the page.  
front of house 12-9-08 vinyl on basement side 12-9-08 Rear of house with vinyl 12-9-08
Added vinyl siding (12/9/08)
Basement side with vinyl (12/9/08)
Rear of the house (12/9/08)
long shot of our house front of house 12-7-08 view of house from corner 12-7-08
Long shot of house (11/23/08
Front of house (12/7/08)
View of house from corner (12/7/08)
Wayne on porch left (wlakout basement) of house house from corner
Wayne on front porch (11/23/08)
Left side & basement door (11/23/08)
House from corner (11/23/08)
begin framing more framing framing on second day
Day 1 of framing house (11/18/08)
Day 2 of framing house (11/19/08)
Day 3 of framing house (11/20/08
Garage & porch from Farmview lot from Farmbrook Foundation & driveway

Back view of garage & porch (10/24/08)
Street in background is Royal Ct.

Our lot from Farmbrook (11/1/08)
Driveway, porch(L), garage(R) (11/1/08)
Gravel in garage floor Basement (side view) Moving dirt
Gravel in Garage Floor (10/20/08)
Basement (side view) (10/20/08)
Moving Dirt (10/21/08)
More blocks Starting garage Garage from Farmview
More Blocks (10/7/08)
Starting Garage (10/10/08)

Back view of garage (10/14/08)
Street in background is Royal Ct.

Lot on Royal Ct. Drilling the well Starting the foundation
Our Lot on Royal Court (9/18/08)
Drilling the Well (9/28/08)
Starting the Foundation (10/7/08)